This project involves replacing the existing timber bridge with a single span concrete bridge structure, with provision for concrete approach slabs to meet current standards. An increase in width will provide dual lane access over the bridge, as per current standards, and transition the road width back to match existing alignment. The deck height will be raised 1.0m to provide a 1 in 2 year flood immunity. The approaches will be raised over a 200m total length to provide flood free access in a 1 in 2 year flood event.
Maintenance Benefits:
Social Benefits:
Economic Benefits:
Safety Improvements:
The bridge site is 270m south east of the Great North Road at Laguna. Map coordinates are 32.9956°S, 151.1322°E.
This project was made possible by TfNSW under the Fixing Country Bridges Program.